City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Rakennuksen tyyppi:
  • Toimistorakennukset
Kartta koko ruudulle Sulje Katunäkymä

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Lue lisää down-arrow.png

Hankkeen tiedot

Hankkeen koko:
2100 m2
Kerrosten lukumäärä:
2
Hankekehittäjä:
CEF Ltd
Rakennusliike:
PCE Ltd
Rakennesuunnittelija:
Curtins
Arkkitehti:
FaulknerBrowns
Toimitusvuosi:
2016
Valmistumisvuosi:
2017

Ota yhteyttä

Michael Scott

Michael Scott

Sales Manager, Deltabeam Products

England & Wales

Puh. +44 1325 318619
Mobiili +44 755 7118470
[email protected]